Decision intelligence for fleets & field operations · Pan-African

The waste in your operation is invisible.
We make it measurable.

Wado replays your historical routes through an engine built on real roads, real capacity and real time windows. Then it shows you, kilometre by kilometre, what a better plan would have done.

WADO / SEQ-01 · loop 00:15Replay · Optimize · Forecast
0%Unnecessary km found
0Field jobs replayed
0Counties covered
0Integrations to run a first comparison
Source: Wado replay of a Kenyan agri-logistics network. Your figure will be different, which is the point of measuring it.
[01] Signal / noise

Every dispatch plan hides a better one.

Move the lens across the network. Outside it: the same stops, assigned by hand. Inside it: what Wado sees.

Illustrative network · 220 stops · 5 depotsLens · solved view
Manual assignmentWado routesDepot
[02] Instruments

Three instruments. One engine.

Measure what happened, plan what should happen, see what is coming. Each one feeds the next.

I-01 · Replay

Measure the gap.

Your executed routes, re-planned for the same day and the same stops.

  • InputHistorical jobs & vehicles
  • OutputPlanned vs executed, day by day
  • MeasuresDistance · coverage · vehicles used
I-02 · Optimize

Plan the routes.

A route per vehicle, built around the constraints you actually run under.

  • EngineProprietary, built for field operations
  • NetworkReal road distances
  • ConstraintsCapacity · time windows · depots
I-03 · Forecast

See demand coming.

Every location's demand pattern is read on its own terms, then forecast accordingly.

  • SignalEach location's own history
  • MethodAdaptive, matched to the pattern
  • FeedsDirectly into route planning
[03] Engagement protocol

No integration required to find out.

Four steps. You only scale once you have seen the comparison on your own data.

  1. P-01

    Understand your operation

    A short conversation about your vehicles, stops and constraints.

  2. P-02

    Validate a data sample

    Confirm which constraints Wado can support for your operation.

  3. P-03

    Run a scoped comparison

    A bounded pilot: Wado's plan against your current process.

  4. P-04

    Agree a paid pilot

    With a measurement plan, agreed before anything scales.

Common questions

Questions we hear from operations leaders.

Operations Demo

Ready to make smarter decisions?

Tell us about your operations. We'll review your request and get back to you within 48 hours.

We review every request personally. No spam, no auto-replies.

Next step

Your history already contains the answer.

Send us a sample of past routes. We will show you what Wado finds in it.